CHAPTER 2.
2.1.1. Campus
Continuity
2.1.2. Materials
2.1.3. Title Sheet
2.1.4. Finish
Schedule
2.1.5. Drawing
Scale
2.1.6. ADA
Specifications
2.1.7. Room
Numbers
2.1.8. On Site
Verification
SECTION 2.2. Project Construction
2.2.1. Codes
2.2.2. Quality and
Workmanship
2.2.3. Changes in
Material and Color
SECTION 2.3. Site Considerations
2.3.1. Development
2.3.2. Topographic
Information
2.3.3. Subsurface
Exploration
2.3.4. Landscaping
2.3.5. Parking and
Service Access
2.3.6. Handrails
2.3.7. Bike Racks
2.4.1. General
2.4.2. Heating
2.4.3. Air
Conditioning
2.4.4. Electrical
2.4.5. Plumbing
2.4.6. Outdoor
Lighting
2.4.7. Water
2.4.8. Sanitary
Sewer
2.4.9. Area Storm
Drainage
2.4.10. Telephone
SECTION 2.6. Special Considerations
2.6.1. Communications
2.6.2. Vending
Machines
2.6.3. Provisions
for Persons with Disabilities
2.6.4. Trash
Disposal Requirements
2.6.5. Energy
Conservation Requirements
2.6.6. Building
Graphics
2.6.7. Clocks
2.6.8. Facilities
and Engineering General Conditions
SECTION 2.7. University of Utah Hospitals and Clinics
Specifications Standards for Architecture
2.7.1. Division 1
- General Requirements
2.7.1.1. [01010]
- Summary of Work
2.7.1.2. [01014]
- Limits of Construction
2.7.1.3. [01500]
- Construction Facilities and Temporary Controls
2.7.1.4. [01510]
- Temporary Facilities (Where Applicable)
2.7.1.5. [01520]
- Contractor's Use of Building Equipment
2.7.1.6. [01550]
- Site Examination and Access
2.7.2. Division 2
- Site Work
2.7.2.1. [02050]
– Demolition
2.7.2.2. [02060]
- Building Demolition
2.7.3. Division 3
– Concrete
2.7.3.1. [03010]
- Concrete Materials
2.7.3.2. [03300]
- Cast-In-Place Concrete
2.7.3.3. [03345]
- Concrete Finishing
2.7.4. Division 4
– Masonry
2.7.4.1. [04200]
- Unit Masonry
2.7.4.2. [04210]
- Campus Face Brick
2.7.5. Division 5
- Metals
2.7.5.1. [05100]
- Structural Metal Framing
2.7.5.2. [05300]
- Metal Decking
2.7.5.3. [05320]
- Metal Floor Deck
2.7.5.4. [05400]
- Cold Formed Metal Framing
2.7.5.5. [05500]
- Metal Fabrications
2.7.6. Division 6
- Wood and Plastics
2.7.6.1. [06010]
- Lumber
2.7.6.2. [06200]
- Finish Carpentry
2.7.6.3. [06240]
- Laminated Plastic
2.7.7. Division 7 -
Thermal and Moisture Protection
2.7.7.1. [07100]
- Waterproofing
2.7.7.2. [07500]
- Membrane Roofing
2.7.7.3. [07510]
- Built-Up Bituminous Roofing
2.7.7.4. [07800]
- Roof Accessories
2.7.7.5. [07810]
- Skylights
2.7.7.6. [07900]
- Sealants
2.7.7.7. [07910]
- Caulking and Sealants
2.7.8. Division 8
- Doors and Windows
2.7.8.1. [08100]
- Metal Doors and Frames
2.7.8.2. [08200]
- Wood and Plastic Doors
2.7.8.3. [08500]
- Metal Windows
2.7.8.4. [08650]
- Sun Control
2.7.8.5. [08700]
- Hardware
2.7.8.6. [08710]
- Finish Hardware
2.7.8.7. [08720]
- Closers
2.7.8.8. [08800]
- Glazing
2.7.8.9. [08810]
- Glass
2.7.8.10. 08900Glazed
Curtain Walls
2.7.9. Division 9
- Finishes
2.7.9.1. [09250]
- Gypsum Drywall
2.7.9.2. [09400]
- Terrazzo and Cast Stone
2.7.9.3. [09500]
- Acoustical Treatment
2.7.9.4. [09510]
- Acoustical Ceilings
2.7.9.5. [09552]
- Cubicle Curtain track and Rollers and Fabrics
2.7.9.6. [09650]
- Resilient Floor Coverings
2.7.9.7. [09660]
- Resilient Floor Coverings-Sheet Vinyl Flooring
2.7.9.8. [097680
- Resilient Base and Accessories
2.7.9.9. [09680]
- Carpeting
2.7.9.10. [09900]
– Painting
2.7.9.11. [09950]
- Wall Covering
2.7.9.12. [09951]
- Impact Resistant Wallcovering
2.7.10. Division 10
- Specialties
2.7.10.1. [10000]
– Miscellaneous
2.7.10.2. [10100]
- Chalk and Tackboards
2.7.10.3. [10110]
- Chalkboards/Markerboards
2.7.10.4. [10800]
- Toilet and Bath Accessories
2.7.11. Division 11
- Equipment
2.7.11.1. [11600]
- Laboratory Equipment
2.7.12. Division 12
- Furnishings
2.7.12.1. [12300]
- Manufactured Cabinets and Casework
2.7.12.2. [12500]
- Window Treatment
2.7.12.3. [12505]
- Adjustable Blinds
2.7.12.4. [12610]
- Landscape Partitions and Components
2.7.12.5. [12670]
- Rugs and Mats
2.7.12.6. [12675]
- Floor Mats and Frames
2.7.13. Division 13
- Special Construction
2.7.13.1. [13130]
- Vending Machine Areas
2.7.13.2. [13170]
- Animal Rooms
2.7.14. Division 14
- Conveying Systems
2.7.14.1. [14200]
- Elevators and Dumbwaiters
2.7.15. Division 15
– Mechanical
2.7.16. Division 16
– Electrical
2.8.1. University
of Utah Hospital (Building 525) Finish Schedule